Click on the hyperlinks for the various sites to view the latest monitoring information
Site |
Sample Point |
Description |
Photo |
|
Oakey Park WTP Monitoring Results
Map of monitoring points for Oakey Park Water Treatment Plant
Pollution Incident Response Management Plan For Oakey Park Water Treatment Plant |
3 |
Drain from sludge lagoon 1 discharging to tributary of Farmers Creek |

|
| |
4 |
Drain from sludge lagoon 2 discharging to tributary of Farmers Creek |

|
| |
5 |
Raw Water Inlet Meter Pit |

|
|
Site |
Sample Point |
Description |
Photo |
|
Lithgow STP Monitoring Results
Pollution Incident Response Management Plan For Lithgow Sewage Treatment Plant |
1 |
UV Disinfection Plant final effluent pit prior to discharge to drainage channel to Farmers Creek |
|
| |
3 |
100 metres upstream of the confluence between the discharge from Point 1 and Farmers Creek |
|
|
4 |
200 metres downstream of the confluence between the discharge from Point 1 and Farmers Creek |
|
|
5 |
Discharge from tertiary lagoon number 3 |

|
|
Site |
Sample Point |
Description |
Photo |
Wallerawang STP Monitoring Results
Pollution Incident Response Management Plan For Wallerawang Sewage Treatment Plant
Map of monitoring points for Wallerawang STP |
1 |
Discharge drain to Pipers Flat Creek/Adams Creek |

|
| |
3 |
100 metres upstream of the confluence between the discharge from Point 1 and Pipers Flat Creek/Adams Creek |
|
| |
4 |
200 metres downstream of the confluence between the discharge from Point 1 and Pipers Flat Creek/Adams Creek |
|
| |
5 |
Discharge from tertiary lagoon number 2 |
|
|
Site |
Sample Point |
Description |
Photo |
Portland STP Monitoring Results
Pollution Incident Response Management Plan For Portland Sewage Treatment Plant
Map of monitoring points for Portland STP |
1 |
Discharge drain to Limestone Creek |

|
|
2 |
Inlet works |

|
|
3 |
100 metres upstream of the confluence between the discharge from Point 1 and Limestone Creek/drainage channel |

|
| |
4 |
200 metres downstream of the confluence between the discharge from Point 1 and Limestone Creek/drainage channel |

|
|
Site |
Sample Point |
Description |
Photo |
Lithgow Solid Waste Facility Monitoring Results
Map of Monitoring Points for Lithgow Solid Waste Facility
Pollution Incident Response Management Plan For Lithgow Solid Waste Facility |
1 |
Groundwater MB1
Located on the upper rim of the north-western corner of the sandy borrow pit on the edge of bushland (north of the landfill area).
|

|
| |
2 |
Groundwater MB5
Located on Sewage Treatment Plant grounds in the small car parking area immediately west of the office. Access is via the road leading to the office building.
|

|
| |
3 |
Groundwater MB6-B
Located on the far eastern boundary of the landfill, at the base of the old landfill slope (situated immediately adjacent to the bushland edge). Access is via the slope shown to the right of this photo or along the graded drainage line extending to the north of the piezometer.
|

|
| |
4 |
Groundwater MB9
Located opposite the old truck-wash bay of the landfill. Access is directly off the landfill road. The piezometer is located approximately 60 metres north of the disused demountable toilet block.
|

|
| |
5 |
MB10
Located adjacent to the demountable storage shed, north of the site-manager’s demountable office. Access is from the main access road to the track leading to the north of these demountables. |
 |
| |
6 |
MB12
Located between the Sewage Treatment Plant fence and the landfill access road. Access is via the landfill access road. |
 |
| |
7 |
Surface Water SW1
Sedimentation basin located in drainage course located to the west of the landfill area. Water is slowed by a retaining wall and controlled release is via a filtered, perforated riser. Access is via the tracks extending north of the site-manager’s office (demountables). |
 |
| |
8 |
MB14
Located on Sewage Treatment Plant grounds, north of the large settling ponds adjacent to the access road to the Sewage Treatment Plant. Access is made either through locked gates off the access road to the landfill or indirectly through the fenced treatment works compound. The piezometer is situated immediately east of a small pond and north of a now-unused gravel access track. |
 |
| |
9 |
Leachate LW1
Located on Sewage Treatment Plant grounds at the base of the slope and edge of concrete paving directly west of the office. Access is via the walkway and stairs over the large steel pipelines. |
 |
| |
10 |
Accumulated gas |
|
Site |
Sample Point |
Description |
Photo |
Portland Solid Waste Facility Monitoring Results
Map of monitoring points for Portland Solid Waste Facility
Pollution Incident Response Management Plan For Portland Solid Waste Facility
|
1 |
Surface Water SW1
Located towards the north-western boundary of the waste depot. SW1 is the most westerly holding pond out of a series of 3 small dams. Access is from the laneway running along the northern boundary of the waste depot. Access could also be made along the western site track, however this road has been blocked.
|

|
| |
3 |
Groundwater MP-1
MP-1. Located immediately west of the sediment basin dam on the northern boundary of the waste depot. The peizometer is situated at the base of the dam bank. Access is from the laneway running along the northern boundary of the waste depot.
|

|
| |
4 |
Groundwater MP-2
MP-2. Located on the slopes immediately south-east of the 3 small holding ponds situated towards the north-western corner of the site (including SW1). This monitoring point has been damaged and broken off to ground level. It is difficult to locate with tall grasses covering the hole. Access is from the laneway running along the northern boundary of the waste depot.
|

|
| |
5 |
Groundwater MP-3
Located on the slopes immediately south of the 3 small holding ponds situated towards the north-western corner of the site (including SW1). Access is from the laneway running along the northern boundary of the waste depot. |
 |
Site |
Sample Point |
Description |
Photo |
| Pump Truck Pollution Incident Response Management Plan |
|
|
 |