Zoning Certificate - Required
under Conveyancing Act to be attached to the Contract
of Sale.
Same Day Service if receipted within at least three
hours before closing time of 4.30 pm, Monday to
Friday.
Building Inspection to ascertain
compliance with the Building Code of Australia.
A Survey Report, with all existing buildings sighted,
is required as an attachment to the application.
Required for development and
construction work under the requirements of the
Building Code of Australia.
Three sets of detailed site plan,
construction plans and specifications are required
with the application but in the case of Mine
Subsidence area four sets of each are required.
A Geotechnical Report of the
site by a Consulting Engineer is required with
the application for all On-Site Sewage Management
Systems to be installed.
It is best to discuss your needs
with an Environmental Planner and Building Surveyor
before submitting the application.
Section 94 charges for rural
roads and bushfire facilities may be applicable
to the development please discuss with your
Environmental Planner.
The fees are based on the estimated
Contract Value of the building work including
GST.
Required
for construction work, when a development approval
has already been given, under the requirements of
the Building Code of Australia.
Three sets of detailed site plan,
construction plans and specifications are required
with the application but in the case of Mine
Subsidence area four sets of each are required.
A Geotechnical Report of the
site by a Consulting Engineer is required with
the application for all On-Site Sewage Management
Systems to be installed (if not previously submitted
with the development application).
It is best to discuss your needs
with a Building Surveyor before submitting the
application.
Section 94 charges for rural
roads and bushfire facilities may be applicable
to the development please discuss with your
Environmental Planner.
The fees are based on the estimated
Contract Value of the building work including
GST.
Complying development is routine development that is defined in State Environmental Planning Policy No 60 which can be certified promplty by Council or an accredited certifier.
Required under Conveyancing Act
to be attached to the Contract of Sale. The fee
is a search fee only and all requests should be
made in writing with all property description details.
Required for placement of Sandwich
Boards, Tables & Chairs or other Goods on Council's
footpath in accordance with Council's Footpath Trading
and Outdoor Eateries Policy.
A copy Insurance details are required to be attached
to the application endorsed to cover Council for
a minimum of $5,000,000.
Required for any work associated
with connection to or alteration to any sewer drainage
on a property. All work is to be carried out by
a licensed plumber.to the satisfaction of Council's
Building Surveyor and all drainage work must be
tested before covering in.
Required
connection or alteration of all On Site Sewage Waste
Systems on properties.
A Geotechnical Report of the
site by a Consulting Engineer is required with
the application for all On-Site Sewage Management
Systems to be installed (if not previously submitted
with the development application or construction
certificate).
Three copies of detailed Site
Plan ,Plans and Specifications (Manufacturers
details of Septic Tank are required with the
application).
On completion of the installation
the On Site Sewage Management System should
be registered with Council to obtain the continuous
operation of the system in an environmentally
friendly and healthy manner.
Required for installation of
any solid fuel heating appliances on a property.
Two copies of detailed Site Plan , Manufacturers
details are required with the application.
Lithgow City Council
PO Box 19
180 Mort Street, Lithgow NSW 2790
General Enquiries
Telephone: (02) 6354 9999
Facsimile:(02) 6351 4259
Email:council@lithgow.nsw.gov.au